To: Members of ITPAC
From: Jack Jackson
Date: 4/2/99
Re: Status report on mediated classroom project
The following is a summary of the current state of the mediated
classroom project at Fort Hays State University. As of the beginning
of the spring semester, there are 22 mediated classrooms and 4 dual
purpose ITV/mediated classrooms in service. These provide student
seating as follows:
|
Building |
Room # |
Seating Capacity |
Building |
Room # |
Seating Capacity |
||
|
McCartney |
213 |
30 |
Cunningham |
143 |
54 |
||
|
301 |
72 |
144 |
54 |
||||
|
312 |
60 |
146 |
75 |
||||
|
Subtotal |
162 |
Subtotal: |
183 |
||||
|
Davis |
103 |
45 |
Malloy |
210 |
30 |
||
|
208 |
42 |
212 |
35 |
||||
|
Subtotal: |
87 |
Subtotal: |
65 |
||||
|
Stroup |
101 |
31 |
Rarick |
114 |
48 |
||
|
105 |
31 |
201 |
90 |
||||
|
114 |
26 |
204 |
34 |
||||
|
Subtotal: |
88 |
205 |
45 |
||||
|
208E |
30 |
||||||
|
Tomanek |
106 |
80 |
301 |
90 |
|||
|
108 |
45 |
306 |
34 |
||||
|
112 |
36 |
312 |
34 |
||||
|
124 |
30 |
324 |
34 |
||||
|
Subtotal: |
191 |
Subtotal: |
439 |
||||
|
Albertson |
169 |
141 |
Total: |
1396 |
|||
|
235 |
40 |
||||||
|
Subtotal: |
181 |
||||||
Projected cost: 5 projectors @ $4300 ea.
$21,500
In addition, two rooms, RH 324 and DH 208 have LCD projectors that
are limited to 640 x 480 or VGA resolution. While these projectors
still function adequately, this resolution is rapidly becoming
outdated as most newer computers now shipping have at least SVGA, 800
x 600 displays and many, especially laptops, now have XGA, 1024 x 768
as standard. These projectors would be the next to be replaced.
Projected cost: 2 projectors @ $4300 ea. $8,600
Replacement of computers:
One classroom, CH 146, still has a 486 computer with only 8 MB of RAM
and Windows 3.11 installed. Replacement of this computer is highest
priority.
Projected cost: 1 computer @ $1400 $1400
Fours classrooms, MC 312, DH 103, RH 301, and CH 146 still have
040 Macs. These have limited memory and slow overall performance by
todays standards. They also should be replaced immediately.
Projected cost: 4 computers @ $1500 $6000
The four ITV/mediated classrooms have only PC computers at the
present time. In order to provide them with Macintosh
computers which would make them compatible with the rest of the
mediated classrooms, i.e. dual platform, 4 additional Macintosh
computers would need to be purchased.
Projected cost: 3 computers @ $1400 $4200
Two of the classrooms, TH 106 and TH 108 have Mac computers with PC
Pentium boards installed. These should be supplemented with PC
computers to provide simpler and better ethernet/internet
connections.
Projected cost: 4 computers @ $1400 $5600
Four additional classrooms, MC 312, RH 301, RH 324, and DH 208
have 1st generation PowerPC computers with 66 mHz processors. These
are rapidly becoming outdated as well.
Projected cost: 4 computers @ $1400 $5600
Upgrade of MH 212:
Malloy 212 is used primarily by music faculty. It was built in
the same fashion as all other mediated classrooms. After using the
room, the music faculty have identified several items that they would
like to see changed to meet their unique needs. These are the need
for better quality sound reproduction and the need to separate the
audio and video sources. The need for the better quality sound
reproduction for teaching music speaks for itself. The other probably
needs some explanation. In all the mediated classrooms, the audio is
designed to follow the video so that the two are always
synchronized. The music faculty want to be able to show video from
one source, perhaps a score shown by the overhead camera, while the
music is being played from a CD. This will require additional
switching.
Projected cost: $2055
Addition of video recording capability to Stroup 114:
Several faculty, especially the nursing faculty, have requested
that the mediated classrooms have the capability of producing a video
recording of the class, as can be done in the ITV classrooms. With
this in mind, we produced a demo tape in Stroup 114 by
installing temporary equipment. All who have seen the demo agree that
it is a viable and worthwhile project. It is proposed that Stroup 114
be retrofitted in this manner to test the viability and the use that
would be made of such an installation. If adequate use is
established, other rooms could also be retrofitted in the future.
Projected cost: $3600
Enhancing usability:
As additional classrooms are added, more faculty are exposed to
the media, and as technology changes, it has been challenging to
incorporate these changes while attempting to maintain uniformity
between rooms. Many faculty are now finding that they are teaching in
more than one mediated classroom in a given day.
One way to make the rooms more similar and more user friendly is to
incorporate wireless touchpad screens to control the equipment rather
than the present system where each item must be controlled
individually. With the touchpad, each piece of equipment is
controlled from the touchscreen with its own screen. For instance, to
control the VCR, one would press VCR icon on main screen,
another screen would appear that would have icons on it for
traditional VCR functions such as play, stop,
rewind, etc. This would make the rooms considerably
easier to use.
Projected cost: $3500 per room
New technology issues:
As new technologies are developed and become mainstream, the
classrooms will have to be updated or they will soon be perceived as
ancient by the students. Education must
compete with not only other universities, but with other
delivery methods to which the students have become accustomed. I feel
that if continual upgrades are done, the classrooms will be viable
teaching environments for several decades. Although none of us have a
crystal ball to predict future developments, I feel that
high-definition television, video-on-demand, higher resolution
computer images, and digital rather than analog distribution of all
media are all technologies that are knocking on the door. These will
all require some changes in equipment and distribution of information
in the classroom environment.
The video-on-demand technology is probably the one of the most
immediate concern. The video-on-demand action plan that was recently
approved may have a significant impact on the mediated classrooms,
depending upon the model chosen. The impact of this is being
considered as the project is evaluated. Until further decisions are
made, I cannot estimate the cost.
Projected cost: ????
Routine maintenence:
Additional budgetary resources will need to allocated on a
continual basis to cover routine maintenance on the rest of the
equipment. While the lifespan of equipment varies according to its
use as well as its nature, all equipment does have a finite lifespan.
I have developed a custom spreadsheet based on one presented as the
result of a major study of estimated live-span of media equipment
developed by the directors of campus-wide media directors at the
public universities in the State of Ohio over the past twenty years.
It has been widely reported in the media and was most recently
updated in 1997. The data is being input into this spreadsheet at the
present time. When completed, it should give a good estimate of
expected cost in future years.
Projected cost: ????/year